ARCHITECTURAL PRACTICES OF PROJECT COMMUNICATION MANAGEMENT IN IRAQ

Authors

  • Hala Taleb Al-Mayahi Razak School of Engineering and Advanced Technology UNIVERSITI TEKNOLOGI MALAYSIA
  • Syuhaida Ismail Razak School of Engineering and Advanced Technology UNIVERSITI TEKNOLOGI MALAYSIA
  • Mohammad Hussaini Wahab Razak School of Engineering and Advanced Technology UNIVERSITI TEKNOLOGI MALAYSIA
  • Wan Nurul Mardiah Wan Mohd Rani Razak School of Engineering and Advanced Technology UNIVERSITI TEKNOLOGI MALAYSIA
  • Rohayah Che Amat Razak School of Engineering and Advanced Technology UNIVERSITI TEKNOLOGI MALAYSIA

DOI:

https://doi.org/10.21837/pm.v16i5.406

Keywords:

communication management, architects, practice, clients, Iraq, competency

Abstract

Architects are significant initiators for the built environment projects, while architecture is all about communicating effectively with clients. Yet, some problems occur in regard to the mutual transfer of project information between those two parties. Thus, it is essential to enrol a proper system for managing project communication through communication management. Communication management is a notable part of the project management body of knowledge that coordinates and manages the process of exchanging information of the designing projects. However, studies confirmed that practices of communication management are often underestimated and overlooked. This article discusses communication management from architects’ perspectives with the objectives of determining the current practice in Iraq and examining the required communication competencies to improve it. An online questionnaire survey was administered via surveymonkey.com to 100 architects working in private firms in Basra City, south of Iraq. The collected data were analysed with Statistical Package of Social Sciences (SPSS) version 23. The analyses for the two objectives showed that Iraqi architects have little information and knowledge in project communication management, where standards and methodologies are not followed. The results also indicated the top-rated competencies to be obtained. Thus, this article concludes that there is a need to introduce communication management as an evolving knowledge area to the architects in Iraq, and develop its implementation through communication competencies that attempt to fulfil clients’ requirement and aspirations regarding the architectural design.

Downloads

Download data is not yet available.

References

Abdulmajeed, N. S. (2017). Methods of controlling the engineering projects in Iraqi engineering consultant organizations. Journal of Babylon University, 25(6), 20552068.

Al-Agele, H. K., & Ali, A. J. (2017). Mismanagement reasons of the projects execution phase. Journal of Engineering, 23(10), 15-29.

Al-Samaraie, S. H., & Al-Hasnawi, A. A. H. (2016). The success of project management according to the characteristics of the changing organizational field research for the sample of workers in the general authority for roads and bridges. Journal of Economics and Administrative Sciences, 22(88), 130-157.

Al Saffar, A., Raheem, K., & Ghaleb, A. A. (2014). Improving the performance of construction project information and communication management using web-based project management systems. Journal of Engineering, 20(10), 79-92.

Ali, S. A. H., & Nabil, M. S. M. K. (2014). Effect of information and communication technology in the local engineering project management. Engineering & Technology Journal, 32(8 Part (A) Engineering), 257-274.

Association for Project Management [APM] (2012). APM body of knowledge. Association for Project Management.

Barrett, D. (2006). Leadership communication: McGraw-Hill: New York.

Baruch, Y., & Holtom, B. C. (2008). Survey response rate levels and trends in organizational research. Human Relations, 61(8), 1139-1160.

Bilczynska Wojcik, A. (2014). Communication management within virtual teams in global projects. Dublin Business School.

Carvalho, M. M. (2008, July). Communication issues in projects management. Portland International Conference on Management of Engineering and Technology. July 27-31, 2008, Portland.

Charvat, J. (2003). Project management methodologies: selecting, implementing, and supporting methodologies and processes for projects. Hoboken, NJ: John Wiley & Sons.

Cheney, G., Christensen, L. T., Zorn, T. E., & Ganesh, S. (2010). Organizational communication in an age of globalization: Issues, reflections, practices (Second Edition). Prospect Heights: Waveland.

Cheung, S. O., Yiu, T. W., & Lam, M. C. (2013). Interweaving trust and communication with project performance. Journal of Construction Engineering and Management, 139(8), 941-950.

Dainty, A., Moore, D., & Murray, M. (2006). Communication in construction: Theory and practice. London: Taylor & Francis.

Den Otter, A., & Prins, M. (2002). Architectural design management within the digital design team. Engineering Construction and Architectural Management, 9(3), 162173.

Doloi, H., Sawhney, A., Iyer, K., & Rentala, S. (2012). Analysing factors affecting delays in Indian construction projects. International Journal of Project Management, 30(4), 479-489.

Foley, J., & Macmillan, S. (2005). Patterns of interaction in construction team meetings. CoDesign, 1(1), 19-37.

Gabriel, G. C., & Maher, M. L. (2002). Coding and modelling communication in architectural collaborative design. Automation in Construction, 11(2), 199-211.

Garland, R. (1991). The mid-point on a rating scale: Is it desirable. Marketing Bulletin, 2(1), 66-70.

George, D., & Mallery, P. (2011). SPSS for Windows step by step: A simple guide and reference 18.0 update. Boston, MA: Allyn & Bacon/Pearson.

Hoezen, M., Reymen, I., & Dewulf, G. (2006). The problem of communication in construction.https://www.researchgate.net/publication/254858936_The_problem_of_communication_in_construction

Holmen, E., Pedersen, A.-C., & Torvatn, T. (2005). Building relationships for technological innovation. Journal of Business Research, 58(9), 1240-1250.

IPMA (2006). ICB-IPMA competence baseline version 3.0. International Project Management Association: Nijkerk.

Ismail, M. F. (2015). Project management skills for new engineers in Jabatan Kerja Raya Malaysia (Master’s Thesis), Universiti Teknologi Malaysia.

Kakepoto, I., Habil, H., Omar, N. A. M., Boon, Y., & Hamdani, M. (2012). Oral communication skills of engineering students of Pakistan in perspective of industrial internships. International Journal of Applied Linguistics & English Literature, 1 (2), 170-176.

Keyton, J. (2010). Communication and organizational culture: A key to understanding work experiences. Thousand Oaks: Sage Publications.

Kitchens, K., & Shiratuddin, M. F. (2007). Interactive Home design in a virtual environment. 7th International Conference on Construction Applications of Virtual Reality. October 22-23, 2007, Penn State University, USA.

Krejcie, R. V., & Morgan, D. W. (1970). Determining sample size for research activities. Educational and Psychological Measurement, 30(3), 607-610.

Lemeshow, S., Hosmer, D. W., Klar, J., & Lwanga, S. K. (1990). Adequacy of sample size in health studies. Chichester, UK: John Wiley and Sons Ltd.

Lunenburg, F. C. (2010). Communication: The process, barriers, and improving effectiveness. Schooling, 1(1), 1-11.

McDonald, H., & Adam, S. (2003). A comparison of online and postal data collection methods in marketing research. Marketing Intelligence & Planning, 21(2), 85-95.

Melzner, J., Feine, I., Hollermann, S., Rutz, J., & Bargstadt, H. (2015, October). The influence of building information modelling on the communication management of construction projects. 15th International Conference on Construction Applications of Virtual Reality, October 5-7, Banff, Canada.

Mnkandla, E. (2013). A review of communication tools and techniques for successful ICT projects. The African Journal of Information Systems, 6(1), 1.

Muhwezi, L., Acai, J., & Otim, G. (2014). An assessment of the factors causing delays on building construction projects in Uganda. International Journal of Construction Engineering and Management, 3(1), 13-23.

Muszynska, K. (2017). Patterns of communication management in project teams. In: Ziemba E. (Eds), Information technology for management: new ideas and real solutions. S.l.: Springer International PU.

Nemoto, T., & Beglar, D. (2014). Developing Likert scale questionnaires. In JALT2013 Conference Proceedings. JALT: Tokyo.

Nightingale, A. (2011). Millennial at work, reshaping the workplace. URL: http://www.pwc. ru/en_RU/ru/hr-consulting/publications/assets/millenials-survey. pdf (dama o6pa^e»UH.

Norouzi, N., Shabak, M., Embi, M. R. B., & Khan, T. H. (2015). The architect, the client and effective communication in architectural design practice. Procedia-Social and Behavioral Sciences, 172, 635-642.

Papke-Shields, K. E., Beise, C., & Quan, J. (2010). Do project managers practice what they preach, and does it matter to project success? International Journal of Project Management, 28(7), 650-662.

Parry, S. B. (1996). Just What Is a Competency? (And Why Should You Care?). Training, 35(6), 58.

Patel, P. (2009). Introduction to Quantitative Methods. Paper presented at the Empirical Law Seminar.

Project Management Institute [PMI] (2007). Project Manager Competency Development (PMCD) Framework. Project Management Institute.

Project Management Institute [PMI] (2013). A Guide to the Project Management Body of Knowledge: PMBOK Guide. Project Management Institute.

Riel, C. B. (1995). Principles of corporate communication. London: Prentice Hall.

Samakova, J., Sujanova, J., & Koltnerova, K. (2013). Project communication management in industrial enterprises. 7th European Conference on Information Management and Evaluation, ECIME 2013. 155-163.

Shen, W. (2011). A BIM-based Pre-occupancy Evaluation Platform (PEP) for facilitating designer-client communication in the early design stage. The Hong Kong Polytechnic University.

Shen, W., Shen, Q., & Sun, Q. (2012). Building Information Modeling-based user activity simulation and evaluation method for improving designer-user communications. Automation in Construction, 21, 148-160.

Sindhu, A. (2011). Sales promotion strategy of selected companies of FMCG Sector in Gujarat Region. (Doctorate Dissertation), Saurashtra University, Rajkot, India.

Siva, J. P. S., & London, K. (2011). Investigating the role of client learning for successful architect-client relationships on private single dwelling projects. Architectural Engineering and Design Management, 7(3), 177-189.

Somiah, M., Osei-Poku, G., & Aidoo, I. (2015). Relative importance analysis of factors influencing unauthorized siting of residential buildings in the Sekondi-Takoradi Metropolis of Ghana. Journal of Building Construction and Planning Research, 3(03), 117.

Taleb, H., Ismail, S., Wahab, M. H., Rani, W. N. M. W. M., & Amat, R. C. (2017). An overview of project communication management in construction industry projects. Journal of Management, Economics, and Industrial Organization, 1(1), 1-8.

Varajao, J., & Cruz-Cunha, M. M. (2013). Using AHP and the IPMA Competence Baseline in the project managers selection process. International Journal of Production Research, 51(11), 3342-3354.

Young, M., & Wagner, R. (2015). PRINCE2® and the IPMA® Competence Baseline (ICB®3).

Zulch, B. (2014). Communication: The foundation of project management. Procedia Technology, 16, 1000-1009