DEVELOPMENT OF PROCEDURAL FRAMEWORK FOR 6R IMPLEMENTATION IN CONSTRUCTION WASTE MANAGEMENT

Authors

  • Joshua Chua Shu Min School of Energy, Geoscience, Infrastructure and Society, HERIOT-WATT UNIVERSITY MALAYSIA
  • Hong Wan Thing School of Energy, Geoscience, Infrastructure and Society, HERIOT-WATT UNIVERSITY MALAYSIA
  • Chai Yoon Jing School of Energy, Geoscience, Infrastructure and Society, HERIOT-WATT UNIVERSITY MALAYSIA
  • Abba Tahir Mahmud School of Civil Engineering and Surveying, UNIVERSITY OF PORTSMOUTH, UK
  • Mohd Ashraf Mohd Fateh School of Construction & Quantity Surveying, College of Built Environment, UNIVERSITI TEKNOLOGI MARA (UITM), MALAYSIA

DOI:

https://doi.org/10.21837/pm.v22i32.1520

Keywords:

Construction Waste Management, Main Contractors, Procedural Framework, Reduce, Reuse, 6R Implementation

Abstract

Sustainable construction has become a top priority in most developing countries including Malaysia. With the rapid development progress in Malaysia, construction waste continues to rise and putting pressure on the social, economy, and environmental sustainability of the nation. Effective construction waste management (CWM) is crucial for achieving the sustainability goals. A well-designed waste management strategy is essential to minimise the environmental impact of waste generation for a more resilient built environment. Past researchers have identified a lack of systematic procedures for CWM and implementation by contractors. This research aims to address this gap by developing a procedural framework for implementing the 6R approach - refuse, reduce, reuse, recycle, recovery, and reflect in the local construction waste management. An extensive literature review on the CWM practices was conducted followed by a preliminary focused-group interview with the Solid Waste Management and Public Cleansing Corporation (SWCorp). A draft procedural framework focusing on 6R waste management was developed following the pilot group studies. To improve the developed framework, semi-structured interviews with the main contractors were conducted for their insights on the current practices and challenges faced in construction waste management, and the feasibility of the proposed procedural framework. The interview findings showed great support to the developed procedural framework with little recommendations incorporated. A final procedural framework was then concluded for implementation. This study presents a significant opportunity for the main contractor in practising sustainable construction waste management (SCWM) through the recommended procedural model.

Downloads

Download data is not yet available.

References

Cheen, K. S., Yieh, L. C., Ashola, O. A., Yahya, N. N. H. N., Han, W. S., & Yusof, M. N. (2018). A study of construction waste practice in selangor. Planning Malaysia, 16. DOI: https://doi.org/10.21837/pm.v16i6.476

Chidiobi, C. C., Booth, C. A., & Lamond, J. E. (2023). Prioritising Materials Procurement and Construction Waste Management attributes. Proceedings of the Institution of Civil Engineers - Waste and Resource Management, 1–15. https://doi.org/10.1680/jwarm.22.00013 DOI: https://doi.org/10.1680/jwarm.22.00013

Esguícero, F. J., Deus, R. M., Battistelle, R., Martins, B. L., & Bezerra, B. S. (2021). Construction and demolition waste management process modeling: A framework for the Brazilian context. Journal of Material Cycles and Waste Management, 23(5), 2037–2050. https://doi.org/10.1007/s10163-021-01247-y DOI: https://doi.org/10.1007/s10163-021-01247-y

Eusuf, M. A., Ibrahim, M., & Islam, R. (2012). The construction and demolition wastes in Klang Valley, Malaysia. Journal of the Malaysian Institute of Planner, 99-124. DOI: https://doi.org/10.21837/pm.v10i3.103

Faridah, A., H., A., Hasmanie, A., H., Hasnain, M., I., (2004), A study on construction and demolition waste from buildings in Seberang Perai, Proceeding of 3rd National Conference in Civil Engineering, Copthorne Orchid, Tanjung Bungah, Malaysia

Iacovidou, E., & Ng, K. S. (2020, July 29). Malaysia Versus Waste. Retrieved from https://www.brunel.ac.uk/news-and-events/news/articles/Malaysia-Versus-Waste

International Trade Administration, ITA. (2023). Malaysia Waste Management Solutions. Retrieved from https://www.trade.gov/market-intelligence/malaysia-waste-management-solutions

Kathiravale, S., Kittappa, S., Ismail, N. M. S., Ghani, Hj. M. K., Bashah, K. N. A., Abd Hamid, Z., & Haji Ibrahim, H. R. (2020, April). Sustainable waste management practices for the construction industry. The Ingenieur, 82(April-June), 36–46.

LAWS OF MALAYSIA, Act 672, SOLID WASTE AND PUBLIC CLEANSING MANAGEMENT ACT 2007 (2017).

Lee, J. C., Thedy, W. H., Ng, J. L., & Lee, S. (2023). Recycled waste of construction industry in Malaysia: A Review. IOP Conference Series: Earth and Environmental Science, 1205(1), 012030 DOI: https://doi.org/10.1088/1755-1315/1205/1/012030

Lin, N. Y., Hassan, Z. F. A., & Halim, I. A. (2021). RECYCLING OF CONSTRUCTION TIMBER WASTE TO ENERGY: A CASE STUDY IN SWCORP. Journal of Surveying, Construction and Property, 12(1), 1-16. DOI: https://doi.org/10.22452/jscp.vol12no1.1

Master Builders Association Malaysia. (2019). Retrieved from http://mbam.org.my/solid-waste-and-public-cleansing-management/

Nagapan, S., Rahman, I. A., & Asmi, A. (2011, October). A review of construction waste cause factors. In Asian Conference on Real Estate: Sustainable Growth Managing Challenges (ACRE) (pp. 967-987).

Nagapan, S., Rahman, I. A., & Asmi, A. (2012, April). Construction waste management: Malaysian perspective. In International Conference on Civil and Environmental Engineering Sustainability (IConCEES), Malaysia (Vol. 2, pp. 299-309).

Ng, L. S., Seow, T. W., & Goh, K. C. (2015). Implementation on solid waste reduction through 3R (NSWM policy) and elements to close gap between policy and contractors in construction industry in Penang. International Journal of Environmental Science and Development, 6(9), 668–675. https://doi.org/10.7763/ijesd.2015.v6.678 DOI: https://doi.org/10.7763/IJESD.2015.V6.678

Ng, L. S., Tan, L. W., & Seow, T. W. (2017). Current practices of construction waste reduction through 3R practice among contractors in Malaysia: Case study in Penang. IOP Conference Series: Materials Science and Engineering, 271, 012039. https://doi.org/10.1088/1757-899x/271/1/012039 DOI: https://doi.org/10.1088/1757-899X/271/1/012039

Salleh, H., Ying, C. K., Hanid, M., Samad, Z. A., Sabli, N. A. M., & Khuzzan, S. M. S. (2022). Development of Guidance for the Adoption of Circular Economy in Construction and Demolition Waste Management. Planning Malaysia, 20 (5), 415–427. DOI: https://doi.org/10.21837/pm.v20i24.1216

SWCorp Malaysia (2018) Sustainable Waste Management in Construction Industry. [PowerPoint presentation]. Bangi-Putrajaya Hotel, 27 September 2018.

Taelman, S., Tonini, D., Wandl, A., & Dewulf, J. (2018). A holistic sustainability framework for waste management in European cities: Concept development. Sustainability, 10(7), 2184. https://doi.org/10.3390/su10072184 DOI: https://doi.org/10.3390/su10072184

The Star. (2023, January 12). SWCorp stepping up enforcement against illegal dumping of construction waste. https://www.thestar.com.my/news/nation/2023/01/12/swcorp-stepping-up-enforcement-against-illegal-dumping-of-construction-waste

Wu, H., Zuo, J., Yuan, H., Zillante, G., & Wang, J. (2019). A review of Performance Assessment Methods for construction and Demolition Waste Management. Resources, Conservation and Recycling, 150. https://doi.org/10.1016/j.resconrec.2019.104407 DOI: https://doi.org/10.1016/j.resconrec.2019.104407

Yadav, B. P., Chandran, H., Ajithkumar, S., Mondal, P., Singh, V. K., & Sharma, V. (2022). Review on Construction Waste Management: India Versus Malaysia. In Advances in Construction Safety: Proceedings of HSFEA 2020 (pp. 207-219). Singapore: Springer Nature Singapore. DOI: https://doi.org/10.1007/978-981-19-4001-9_18

Zainon, N., Myeda, N. E., Bakar, A. A., Chuing, L. S., Rahim, F. A. M., Zyed, Z. A. S., ... & Lim, M. Z. (2022). The Assessment of Waste Segregation Exercise Among Malaysian Contractors: A Descriptive Analysis. Journal of Design and Built Environment, 22(1), 72-87. DOI: https://doi.org/10.22452/jdbe.vol22no1.5

Downloads

Published

2024-07-29

How to Cite

Min, J. C. S., Thing, H. W., Jing, C. Y., Mahmud, A. T., & Mohd Fateh, M. A. (2024). DEVELOPMENT OF PROCEDURAL FRAMEWORK FOR 6R IMPLEMENTATION IN CONSTRUCTION WASTE MANAGEMENT. PLANNING MALAYSIA, 22(32). https://doi.org/10.21837/pm.v22i32.1520