BIG DATA ANALYTICS (BDA) FRAMEWORK FOR CONSTRUCTION COST ESTIMATION IN MALAYSIA

Authors

  • Muhammad Hadi Mustafa Centre for Building, Construction & Tropical Architecture (BuCTA), Faculty of Built Environment, UNIVERSITI MALAYA
  • Faizul Azli Mohd Rahim Centre for Building, Construction & Tropical Architecture (BuCTA), Faculty of Built Environment, UNIVERSITI MALAYA
  • Ain Farhana Jamaludin Centre For Sustainable Urban Planning & Real Estate (SUPRE), Faculty of Built Environment, UNIVERSITI MALAYA
  • Kwang Yi Hin Centre for Building, Construction & Tropical Architecture (BuCTA), Faculty of Built Environment, UNIVERSITI MALAYA

DOI:

https://doi.org/10.21837/pm.v22i32.1507

Keywords:

Big Data, Analytics, Construction Cost Estimation, Cost Overrun, Framework

Abstract

The construction industry is undergoing significant changes due to the growing volume of data, necessitating the adoption of Big Data Analytics (BDA) for improved project management. Construction projects are inherently uncertain, often resulting in cost overruns. This research focuses on the development of a framework for implementing big data analytics in the estimation of construction costs within the Malaysian construction sector. To achieve this goal, a quantitative research approach was employed, which involved an examination of the industry's awareness of construction cost estimation, comprehension of big data analytics processes in the context of cost estimation, and an exploration of the challenges and potential solutions associated with the integration of BDA. The resultant framework for construction cost estimation via BDA is a dynamic and evolving tool. It is refined iteratively based on insights derived from a questionnaire survey distributed to Consulting Quantity Surveying Practice (CQSP) registered with the Board of Quantity Surveyors Malaysia (BQSM). The BDA framework emerges as a fundamental tool for cost estimators, notably quantity surveyors, facilitating the digital transformation of the cost estimation process and substantively enhancing the precision of contemporary cost estimation methodologies.

Downloads

Download data is not yet available.

References

Agyekum, B., Kissi, E., Yamoah Agyemang, D., & Badu, E. (2018). Examining barriers for the utilisation of non-traditional cost estimating models in developing countries. Journal of Engineering, Design and Technology, 16(6), 814–827. https://doi.org/10.1108/JEDT-02-2018-0021 DOI: https://doi.org/10.1108/JEDT-02-2018-0021

Ali, A. (2018). Risk Factors That Leading to Cost and Time Overrun in Mega Construction Projects in Malaysia. International Journal of Management and Commerce Innovations, 6(1), 2251–2254. https://doi.org/10.18034/abcra.v6i3.332 DOI: https://doi.org/10.18034/ra.v6i3.332

Basaif A. A., Alashwal A. M, Mohd-Rahim F. A., Abd Karim S. B., & Loo S.L. (2020). Technology Awareness of Artificial Intelligence (AI) Application for Risk Analysis in Construction Projects. Malaysian Construction Research Journal, 9(1), pp 182-195.

Buehler, M., Buffet, P. P., & Castagnino, S. (2018). The Fourth Industrial Revolution is about to hit the construction industry. Here’s how it can thrive. World Economic Forum. https://www.weforum.org/agenda/2018/06/construction-industry-future-scenarios-labour-technology/

Concord Group. (2023). WHAT IS CONSTRUCTION COST ESTIMATING? Concord Group. https://www.concord-cc.com/blog/what-is-construction-cost-estimating/

Construction Industry Development Board Malaysia. (2020). Construction 4.0 Strategic Plan (2021-2025). https://icsc-my.org/wp-content/uploads/2021/03/Construction-4.0-Strategic-Plan-2021-2025.pdf

Flyvbjerg, B., Rothengatter, W., & Bruzelius, N. (2003). Megaprojects and Risk: An Anatomy of Ambition. International Journal of Public Sector Management, 17(3), 275–277. https://doi.org/10.1108/09513550410530199 DOI: https://doi.org/10.1017/CBO9781107050891

Garyaev, N., & Garyaeva, V. (2019). Big data technology in construction. E3S Web of Conferences, 97. https://doi.org/10.1051/e3sconf/20199701032 DOI: https://doi.org/10.1051/e3sconf/20199701032

Ismail, S. A., Bandi, S., & Maaz, Z. N. (2018). An Appraisal into the Potential Application of Big Data in the Construction Industry. In International Journal of Built Environment and Sustainability (Vol. 5, Issue 2). https://doi.org/10.11113/ijbes.v5.n2.274 DOI: https://doi.org/10.11113/ijbes.v5.n2.274

Jumas, D.Y., Mohd-Rahim, F.A., Zainon, N., & Wayudi, U. (2018). Improving Accuracy of Conceptual Cost Estimation Using MRA and ANFIS in Indonesian Building Projects. Built Environment Projects and Asset Management, Vol.8(4), 348-357. https://doi.org/10.1108/BEPAM-11-2017-0111. DOI: https://doi.org/10.1108/BEPAM-11-2017-0111

Kamaruddeen, A. M., Sung, C. F., & Wahi, W. (2020). A study on factors causing cost overrun of construction projects in Sarawak, Malaysia. Civil Engineering and Architecture, 8(3), 191–199. https://doi.org/10.13189/cea.2020.080301 DOI: https://doi.org/10.13189/cea.2020.080301

Kissi, E., Adjei-Kumi, T., & Badu, E. (2016). Critical Barriers to the Practice of Effective Cost Planning in the Ghanaian Construction Industry. Journal of Construction Engineering and Project Management, 6(2), 8–15. https://doi.org/10.6106/jcepm.2016.6.2.008 DOI: https://doi.org/10.6106/JCEPM.2016.6.2.008

Lee, J. (2020). A Framework of Big Data Analytics (BDA) in Achieving Sustainable Construction In Malaysia Faculty Of Built Environment. University of Malaya.

Maaz, Z., Bandi, S., & Amirudin, R. (2018). Big Data in The Construction Industry: Potential Opportunities and Way Forward. The Turkish Online Journal of Design, Art and Communication, 1470–1480. https://doi.org/10.7456/1080SSE/197

Murkred, M. A. A., & Zheng, J. (2017). Use of Big Data to Improve Environmental Sustainability in Developing Countries. International Journal of Business and Management, 12. https://doi.org/doi:10.5539/ijbm.v12n11p249 DOI: https://doi.org/10.5539/ijbm.v12n11p249

Mustafa, M. H., Ali, M., HasYun Hashim, K. S., & Mohd Suhaimi, M. S. (2020). A Generic Process of Documentation and Data Management for Historical Malay Architecture using BIM. Planning Malaysia, 18(12). https://doi.org/10.21837/pm.v18i12.744 DOI: https://doi.org/10.21837/pm.v18i12.744

Mustafa, M.H., Mohd Rahim, F.A., & Chia, L.K., (2023). The role of 5D building information modelling in Construction Project Cost Management: An overview and future directions. Journal of Project Management Practice, 3(1), 95–112. https://doi.org/10.22452/jpmp.vol3no1.5 DOI: https://doi.org/10.22452/jpmp.vol3no1.5

Oussous, A., Benjelloun, F. Z., Ait Lahcen, A., & Belfkih, S. (2017). Big Data technologies: A survey. Journal of King Saud University - Computer and Information Sciences, 30(2018), 431–448. https://doi.org/10.1016/j.jksuci.2017.06.001 DOI: https://doi.org/10.1016/j.jksuci.2017.06.001

Pathak, R. (2021). What is Big Data Analytics? Definition, Advantages, and Types. Analytics Steps. https://www.analyticssteps.com/blogs/what-big-data-analytics-definition-advantages-and-types

ProEst. (2020). CONSTRUCTION COST ESTIMATING: WHAT IS IT & HOW IT WORKS. ProEst. https://proest.com/construction/estimating/#:~:text=Conclusion-,What is construction cost estimating%3F,and the necessary budget allocations.

Pua, T. (2017). KLIA2 fee hiked to cover sky high-cost overruns? Malaysiakini. https://www.malaysiakini.com/news/405527

Reyes-Veras, P. F., Renukappa, S., & Suresh, S. (2021). Challenges faced by the adoption of big data in the Dominican Republic construction industry: An empirical study. Journal of Information Technology in Construction, 26, 812–831. https://doi.org/10.36680/J.ITCON.2021.044 DOI: https://doi.org/10.36680/j.itcon.2021.044

Shehu, Z., Endut, I. R., Akintoye, A., & Holt, G. D. (2014). Cost overrun in the Malaysian construction industry projects: A deeper insight. International Journal of Project Management, 32(8), 1471–1480. https://doi.org/10.1016/j.ijproman.2014.04.004 DOI: https://doi.org/10.1016/j.ijproman.2014.04.004

Siddiqa, A., Hashem, I. A. T., Yaqoob, I., Marjani, M., Shamshirband, S., Gani, A., & Nasaruddin, F. (2016). A survey of big data management: Taxonomy and state-of-the-art. Journal of Network and Computer Applications, 71, 151–166. https://doi.org/10.1016/j.jnca.2016.04.008 DOI: https://doi.org/10.1016/j.jnca.2016.04.008

Taylor, P. (2022). Volume of data/information created, captured, copied, and consumed worldwide from 2010 to 2020, with forecasts from 2021 to 2025. Statista. https://www.statista.com/statistics/871513/worldwide-data-created/

Ullah, K., Abd, H. A., Sasithran, N., Samiullah, S., & Khan, M. S. (2018). Measue to Mitigate Causative Factors of Budget Overrun in Malaysian Building Projects. International Journal of Integrated Engineering, 10(9). https://doi.org/doi.org/10.30880/ijie.2018.10.09.032 DOI: https://doi.org/10.30880/ijie.2018.10.09.032

Downloads

Published

2024-07-29

How to Cite

Mustafa, M. H., Mohd Rahim, F. A., Jamaludin, A. F., & Hin, K. Y. (2024). BIG DATA ANALYTICS (BDA) FRAMEWORK FOR CONSTRUCTION COST ESTIMATION IN MALAYSIA. PLANNING MALAYSIA, 22(32). https://doi.org/10.21837/pm.v22i32.1507

Most read articles by the same author(s)

<< < 1 2