Abstract

The practice of efficient and timely payment in construction projects is a major factor that can contribute to the success of a project. Delays in payment to subcontractor(s) by main contractor and client on construction projects in the Malaysian construction industry is considered to be a significant factor of concern. It causes severe cash flow problems to subcontractor(s) and this condition may lead to a devastating impact to the contractual payment chain. Withholding or delaying payment creates financial hardship for the construction companies and its impacts are sometimes so harsh that some companies have to close down their services. The research methodology adopted was the questionnaire survey analysis based on thirty (37) respondents from selected main contractors and sub-contractors in Gombak, Selangor. The data and information were also gathered from interviews analysis. From the research findings, among the factor of late payment from the client is payment withhold by the client. Meanwhile, the factor of late payment from the main contractor is when the term of “pay when paid” is applied. To improve the payment situation, the findings of this study suggest that there must be dedicated enforcing provisions for payment delay in contracts. This is proposed by introducing the standard form of contract clause regarding payment between the main contractor and domestic subcontractor which include levying charges on overdue payments.

Downloads

Download data is not yet available.

References

Al-Hammad, A. (1993). Factors Affecting the Relationship etween Contractors and their Subcontractors in Saudi Arabia, Building Research and Information, Vol. 21, No. 5, pp. 269-273.

Amoako, K. B. (2011). The Effect of Delayed Payment on Cash Flow Forecasting of Ghanaian Road Contractors. (Commonwealth Executive Master in Business Administration), Institute of Distance Learning, Kwame Nkrumah University of Science and Technology (KNUST).

Ansah, S.K. (2011). Causes and Effects of Delayed Payments by Clients on Construction Projects in Ghana.

Arditi, D. and Chotibhongs, R. (2005), Issues in subcontracting practice. Journal of Construction Engineering and Management, (ASCE) Vol. 131, No. 8, pp. 866878.

Associated General Contractors of America (AGCA). (n.d.). Retrieved December 1, 2019, from http://www.agc.org

Azman, M. N. A., Dzulkalnine, N., Hamid, Z. A., & Beng, K. W. (2014). Payment issue in Malaysian construction industry: Contractors’ perspective. Jurnal Teknologi, 70(1). Barton, H. & Tsourou, C. (2000). Healthy Urban Planning. London: Spon.

Badroldin, M. K. A. M., Hamid, A. R. A., Raman, S. A., Zakaria, R., & Mohandes, S. R. (2016). Late Payment Practices in the Malaysian Construction Industry. Malaysian Journal of Civil Engineering, Special Issue (3), 149-162.

Chiang, Y. H. (2009). Subcontracting and Its Ramifications: A Survey of The Building Industry in Hong Kong. International Journal of Project Management, 27(1), 8088.

Chong, J. F. (2006). A Study on Domestic Subcontractor. Retrieved from http://www. efka.utm

Construction Industry Development Board (CIDB). (2013). Subcontracting in the South African Construction Industry; Opportunities for Development. 48.

Construction Industry Working Group on Payment (WG 10). (2007). The Importance of Payment in the Construction Industry. Report on Enactment of Construction Industry Payment and Adjudication Act (CIPAA).

Danuri, M. M., Munaaim, M. C., Rahman, H. A., & Hanid, M. (2006). Late and NonPayment Issues in The Malaysian Construction Industry-Contractor Perspective. In International Conference on Construction, Culture, Innovation and Management (CCIM).

Din, N. M. D. N., & Ismail, Z. (2014). Construction Industry Payment and Adjudication Act (CIPAA) Remedying Payment Issues: CIDB G7 Contractor’s Perspective. Journal of Technology Management and Business, 1(1).

Fahada, N., & Razak, A. (2013). The Impact of Multilayer Subcontracting System in Construction Industry in Pahang.

Enshassi, A., Arain, F., & Tayeh, B. (2012). Major Causes of Problems Between Contractors and Subcontractors in the Gaza Strip. Journal of Financial Management of Property and Construction, 17(1), 92-112.

Ismail, M. N. (2008). Pengenalan Kepada Pentadbiran Kontrak (Berdasarkan Borang Kontrak JKR 203A).

Malaysian National Agency News (BERNAMA) (2005). Retrieved December 1, 2019, from https://www.bernama.com/

Longworth Consulting. (2009). Longworth Consulting. Retrieved December 1, 2019, from

http://www.longworthconsulting.co.uk/construction_contracts/payment_certifica

te.htm

Metri, B. A. (2005). TQM Critical Success Factors for Construction Firms. Management: Journal of Contemporary Management Issues, 10(2), 61-72.

Ng, C. Y. (2006). Problems Associated with Nominated Subcontractors in Malaysian Construction Industry. Oxford: Elsevier Butterworth-Heineman.

Odeyinka, H. A., & Kaka, A. (2005). An Evaluation of Contractors’ Satisfaction with Payment Terms Influencing Construction Cash Flow. Journal of Financial Management of Property and Construction, 10(3), 171-180.

Palliyaguru, R. S., Amaratunga, R. D. G., & Rameezdeen, R. (2006). Financing Contractors in Developing Countries: Impact of Mobilization Advance Payment.

Pertubuhan Akitek Malaysia (PAM). (2006). Agreement and Conditions of PAM Contract 2006 (without quantities) (pp. 1 -9). pp. 1-9. Kuala Lumpur: PAM Publication.

Rahman, M. S. A. (2012). Pengawalan Kos Projek Pembinaan oleh Kontraktor (Doctoral dissertation, Universiti Teknologi Malaysia).

Sambasivan, M., & Soon, Y. W. (2007). Causes and Effects of Delays in Malaysian Construction Industry. International Journal of Project Management, 25(5), 517526.

She, L. Y. (2011). Factors which Impact upon the Selection of Dispute Resolution Methods for Commercial Construction in the Melbourne Industry: Comparison of the Dispute Review Board with Other Alternative Dispute Resolution Methods. COBRA 2011 - Proceedings of RICS Construction and Property Conference, 6175.

Shiner, L. (2013). 10 Steps to Building a More Profitable Construction Business.

Suhaini, A. (2005). No joy for the small builders. The Star online, 8 May 2005. [Retrieved June 13, 2005]

Supardi, A., Adnan, H., & Mohammad, M. F. (2010). Sub-Contractors’ readiness on the Malaysian Security of Payment Legislation in Construction Industry.

Tayeh, B. A. (2009). The Relationship between Contractors and Their Subcontractors in the Gaza Strip.

Teku, A. Y. (2015). Effects of Delayed Payment on Projects and Stakeholders: A Case Study of Keta Municipal Assembly (Doctoral dissertation).

Ye, K. M., & Rahman, A. H. (2010). Risk of Late Payment in the Malaysian Construction Industry. International Scholarly and Scientific Research and Innovation, 4(5), 8189.

Zolkafli, U. K., Zakaria, N., & Salleh, H. (2011). The Comparative Study of International Standard Form of Building Contract (FIDIC Conditions of Contracts for Construction-The New Red Book 1999) and Malaysian's Standard Form of Building Cotract (PWD 203A). In Int. Engineering Education Conf.

Downloads

Published

2020-04-08

How to Cite

Che Haron, R., & Arazmi, A. L. (2020). LATE PAYMENT ISSUES OF SUBCONTRACTORS IN MALAYSIAN CONSTRUCTION INDUSTRY. PLANNING MALAYSIA, 18(11). https://doi.org/10.21837/pm.v18i11.711