TOWARDS DIGITAL FUTURE: UNLOCKING STRATEGIES TO INTEGRATE E-TENDERING IN THE CONSTRUCTION LANDSCAPE

Authors

  • Nur Mardhiyah Aziz Department of Quantity Surveying, Faculty of Built Environment, UNIVERSITI MALAYA, KUALA LUMPUR, MALAYSIA

DOI:

https://doi.org/10.21837/pm.v22i32.1500

Keywords:

e-tendering, construction industry, successful strategy

Abstract

The advancement of technology has introduced the electronic tendering process commonly known as e-tendering, as a promising approach in the construction industry. Despite its potential benefits, the adoption of e-tendering remains limited in Malaysia. This article intends to reveal the reasons behind the poor adoption of e-tendering in view of integrating improvement in the construction procurement process. Suitable strategies for successful e-tendering adoption will be proposed to transform the Malaysian construction industry into a digital future. Semi-structured interviews were conducted with 15 experienced construction industry players, each with at least five years of experience using the e-tendering system. The snowball sampling technique was employed to identify suitable respondents. Data collected were analysed using thematic analysis, revealing six main groups of strategies: people, process, work environment, service provider, cost and technology. These proposed strategies can serve as a practical guideline for the construction industry players seeking to adopt e-tendering systems. Additionally, they offer valuable insights for construction companies and policymakers in planning, revising, and prioritising appropriate strategies and practices for the future development or upgrading of e-tendering systems within the construction landscape. This study significantly contributes to the knowledge on e-tendering adoption, particularly in Malaysia, and provides valuable support for researchers, construction industry players, and policymakers in their efforts to embrace a digital future in the construction sector.

Downloads

Download data is not yet available.

References

Chan, A. P. C., & Owusu, E. K. (2022). Evolution of Electronic Procurement: Contemporary Review of Adoption and Implementation Strategies. Buildings, 12(2), 198. MDPI AG. Retrieved from http://dx.doi.org/10.3390/buildings12020198 DOI: https://doi.org/10.3390/buildings12020198

Chew, W. C. (2018). Awareness of E-tendering system in Malaysia construction Industry, (Undergraduate’s thesis), Tunku Abdul Rahman University College, Tunku Abdul Rahman University College Institutional Repository, available at: http://eprints.tarc.edu.my/166/ (accessed 3 January 2022).

Hassan, M. (2021). Implementation of e-procurement with BIM collaboration in the construction industry (Unpublished master's thesis). International Master of Science in Construction and Real Estate Management Joint Study Programme of Metropolia UAS and HTW Berlin, Germany.

Ibem, E. O. and Laryea, S. (2016). E-tendering in the South African construction industry. International Journal of Construction Management, 17(4), 310–328, doi: 10.1080/15623599.2016.1222666. DOI: https://doi.org/10.1080/15623599.2016.1222666

Kajendran, K. (2022). Exploring the lesson learnt by implementing e-tendering: A review of literature in Sandanayake, Y.G., Gunatilake, S. and Waidyasekara, K.G.A.S. (eds). Proceedings of the 10th World Construction Symposium, 24-26 June 2022, Sri Lanka. [Online]. pp. 479-491. DOI:https://doi.org/10.31705/WCS.2022.39. Available from: https://ciobwcs.com/2022-papers/ DOI: https://doi.org/10.31705/WCS.2022.39

Lee, H. M. (2019). E-Tendering: improvement model in Malaysia construction industry public sector. (Unpublished undergraduate’s thesis), Universiti Malaya.

Lim, C. Y., Aziz, N. M., & Mohd-Rahim, F. (2022). Adapting To A New Normal During Covid-19: Leveraging The Smart Building System With BIM Integration For Lifecycle Sustainability. Planning Malaysia. 20. 10.21837/pm.v20i24.1198. DOI: https://doi.org/10.21837/pm.v20i24.1198

M. Ashaari, N.I., & Suhaida, S.K. and Kam, K.C. (2018). The implementation of e- tendering: the clients’ perspective. Journal of BIMP-EAGA Regional Development, 4 (1), 21-30. DOI: https://doi.org/10.51200/jbimpeagard.v4i1.3111

Mangitung, D.M., Nirmalawati, Asikin, A.H., Ningsih, G., R., Musdalifah, Ningrum, S.S. (2022). Important factors influencing the successful implementation of electronic tenders based on the perceptions of consultants, contractors and project owners in Palu. IOP Conference Series: Earth and Environmental Science, 1075(1), 012036. https;//doi.org/10.1088/1755-1315/1075/1/012036 DOI: https://doi.org/10.1088/1755-1315/1075/1/012036

Mehdipoor, A., Iordanova, I., Mehdipoorkaloorazi, S., & Benisi Ghadim, H. (2022). Implementation of electronic tendering in malaysian construction industry: A case study in the preparation and application of e-tendering. International Journal of Automation & Digital Transformation, 1, 69–74. DOI: https://doi.org/10.54878/s2wcrx08

Omran, J. (2020). The importance of e-construction implementation in the Syrian projects. Tishreen University Journal for Research and Scientific Studies - Engineering Sciences Series, 24 (5),367- 381.

Pollock, T. (2019). The Difference Between Structured, Unstructured & Semi-Structured Interviews. available at: https://www.oliverparks.com/blog-news/the-difference-between-structured-unstructured-amp-semi-structured-interviews (accessed 17 April 2022).

Sitsofe, K. W., Ann, T. W. Y., Amos, D., Gabriel, N., Edwards, D. J. (2022) Modeling the influence patterns of barriers to electronic procurement technology usage in construction projects. Engineering, Construction and Architectural Management 2.

Sunmola, F. T. and Shehu, Y. U. (2020). A Case Study on Performance Features of Electronic Tendering Systems. Procedia Manufacturing, 51, 1586–1591, doi: 10.1016/j.promfg.2020.10.221. DOI: https://doi.org/10.1016/j.promfg.2020.10.221

Tan, J.J.R. and Suhana-Kamarudin, S. (2016). Application of e-tendering in Malaysia construction industry. INTI Journal Special Edition. Tender Tailor (n.d.), “How is e-tendering used?”, available at: https://www.tendertailor.com/Home/WhyETendering (accessed 23 June 2022).

Tung, Yew-Hou & Chia, Fah Choy & Yong, Felicia. (2021). Exploring The Usage Of Digital Technologies For Construction Project Management. Planning Malaysia. 19. 10.21837/pm.v19i17.983. DOI: https://doi.org/10.21837/pm.v19i17.983

Wimalasena, N. N. and Gunatilake, S. (2018). The readiness of construction contractors and consultants to adopt e-tendering. Construction Innovation, 18 (3), 350–370, doi: 10.1108/ci-03-2017-0025. DOI: https://doi.org/10.1108/CI-03-2017-0025

Yahya, M. A., Skitmore, M., Bridge, A., Nepal, M. P. and Cattell, D. (2018). E-tendering readiness in construction: an a priori model”, International Journal of Procurement Management. 11 (5), 608- 638, doi: 10.1504/ijpm.2018.094356. DOI: https://doi.org/10.1504/IJPM.2018.094356

Yevu, S. K., Yu, A. T., & Darko, A. (2021). Barriers to electronic procurement adoption in the construction industry: A systematic review and Interrelationships. International Journal of Construction Management, 23(6), 964–978. https://doi.org/10.1080/15623599.2021.1946900 (PDF) DOI: https://doi.org/10.1080/15623599.2021.1946900

Downloads

Published

2024-07-29

How to Cite

Aziz, N. M. (2024). TOWARDS DIGITAL FUTURE: UNLOCKING STRATEGIES TO INTEGRATE E-TENDERING IN THE CONSTRUCTION LANDSCAPE. PLANNING MALAYSIA, 22(32). https://doi.org/10.21837/pm.v22i32.1500