CONSTRUCTION PROJECT FAILURE: INVESTIGATING CAUSES OF INEFFECTIVE BUILDING INFORMATION MODELLING EXECUTION PLANS

Authors

  • Mashanim Mahazir Faculty of Civil Engineering Technology, UNIVERSITI MALAYSIA PAHANG AL-SULTAN ABDULLAH, KUANTAN, MALAYSIA
  • Rahimi A. Rahman Faculty of Civil Engineering Technology, UNIVERSITI MALAYSIA PAHANG AL-SULTAN ABDULLAH, KUANTAN, MALAYSIA
  • Nurhaizan Mohd Zainudin Faculty of Industrial Management, UNIVERSITI MALAYSIA PAHANG AL-SULTAN ABDULLAH, KUANTAN, MALAYSIA
  • Salmaliza Salleh Faculty of Engineering, UNIVERSITI TEKNOLOGI PETRONAS, SERI ISKANDAR MALAYSIA

DOI:

https://doi.org/10.21837/pm.v22i32.1492

Keywords:

Building Information Modelling, BIM Execution Plan, BEP failure, construction project, thematic analysis

Abstract

The successful implementation of Building Information Modelling (BIM) is contingent upon effectively executing BIM Execution Plans (BEPs). This study aims to investigate the causes that contribute to the development of ineffective BEPs that ultimately result in construction project failures. Interview data with twenty BIM professionals were collected on causes contributing to the development of ineffective BEPs. The collected data was analyzed using thematic analysis. The analysis revealed three categories contributing to ineffective BEPs: people, process, and technology. There are 11, 6, and 1 causes related to people, process, and technology, respectively. The finding suggests that incompetency, lack of knowledge in BIM, individual attitude, poor data management, and insufficient technology used are the causes that contribute to ineffective BEPs. The outcomes of this study offer substantial insights into the Architecture, Engineering, and Construction (AEC) industry in developing effective BEPs, thereby ensuring the successful delivery of BIM-based construction projects.

Downloads

Download data is not yet available.

References

Abbas, M. A., Ajayi, S. O., Oyegoke, A. S., & Alaka, H. (2022). A cloud-based collaborative ecosystem for the automation of BIM execution plan (BEP). Journal of Engineering, Design and Technology, 24421. https://doi.org/10.1108/JEDT-02-2022-0128 DOI: https://doi.org/10.1108/JEDT-02-2022-0128

Abu Bakar, A. R., Haron, A. T., & Rahman, R. A. (2021). Building Information Modelling Execution Plan (BEP): A Comparison of Global Practice. International Journal of Engineering Technology and Sciences, 7(2), 63–73. https://doi.org/10.15282/ijets.7.2.2020.1005 DOI: https://doi.org/10.15282/ijets.7.2.2020.1005

Ahmad, Y., Mustapha, S. Z., Ali, S. S. M., Hamid, S. N. F. A., Aziz, N. A., Tahir, N. S., Azman, U. N. N., Zamri, N. E. M. M., Jamil, A. A. A., Ayob, N. A., Aziz, M. N., Hanafiah, M. H., Arsat, A. R., & Hassan, M. S. N. A. (2023). From Crisis To Recovery: Malaysia’S Policy Responses To Covid-19 and Its Implications. Planning Malaysia, 21(6), 526–546. https://doi.org/10.21837/PM.V21I30.1418 DOI: https://doi.org/10.21837/pm.v21i30.1418

Ayerra, I., Castronovo, F., Ventura, S. M., & Nikolic, D. (2021). Next Steps in Bim Execution Planning: a Review of Guides in the Usa. Proceedings of the European Conference on Computing in Construction, 277–284. https://doi.org/10.35490/EC3.2021.150 DOI: https://doi.org/10.35490/EC3.2021.150

Braun, V., & Clarke, V. (2006). Using thematic analysis in psychology. Qualitative Research in Psychology, 3(2), 77–101. https://doi.org/10.1191/1478088706qp063oa DOI: https://doi.org/10.1191/1478088706qp063oa

CIDB. (2017). BIM Guide 4: BIM Execution Plan (BEP). In Construction Industry Development Board Malaysia. http://www.designingbuildings.co.uk/wiki/BIM_execution_plan_BEP

Dillon, D. R. (2012). Qualitative Research. 1–8.

Farah, S. I., Nur, D. S., Muneera, E., & Rahimi, A. R. (2019). the Barriers Factors and Driving Forces for Bim Implementation in Malaysian Aec Companies. Journal of Advanced Research in Dynamical and Control Systems, 11(3), 275–281.

Farouk, A. M., Zulhisham, A. Z., Lee, Y. S., Rajabi, M. S., & Rahman, R. A. (2023). Factors, Challenges and Strategies of Trust in BIM-Based Construction Projects: A Case Study in Malaysia. Infrastructures, 8(1). https://doi.org/10.3390/infrastructures8010013 DOI: https://doi.org/10.3390/infrastructures8010013

Fosse, R., Spitler, L., & Alves, T. (2016). Deploying BIM in a heavy civil project. IGLC 2016 - 24th Annual Conference of the International Group for Lean Construction, 43–52.

Hadzaman, N. A. H., Takim, R., & Mohammad, A. H. N. M. F. (2016). An exploratory study: Building information modelling execution plan (BEP) procedure in mega construction projects. Malaysian Construction Research Journal, 18(1), 29–40.

Lin, Y. C., Chen, Y. P., Huang, W. T., & Hong, C. C. (2016). Development of BIM execution plan for BIM model management during the pre-operation phase: A case study. Buildings, 6(1). https://doi.org/10.3390/buildings6010008 DOI: https://doi.org/10.3390/buildings6010008

Man, S. S., Chan, A. H. S., & Wong, H. M. (2017). Risk-taking behaviors of Hong Kong construction workers – A thematic study. Safety Science, 98, 25–36. https://doi.org/10.1016/j.ssci.2017.05.004 DOI: https://doi.org/10.1016/j.ssci.2017.05.004

Mayer, P., Funtík, T., Erdélyi, J., Honti, R., & Cerovšek, T. (2021). Assessing the duration of the lead appointed party coordination tasks and evaluating the appropriate team composition on bim projects. Buildings, 11(12). https://doi.org/10.3390/buildings11120664 DOI: https://doi.org/10.3390/buildings11120664

Ogunnusi, M., Hamma-adama, M., Salman, H., & Kouider, T. (2020). Covid-19 Pandemic the Effects and Prospects in the Construction Industry. International Journal of Real Estate Studies, 4(2), 120–128. https://rgu-repository.worktribe.com/preview/1001756/OGUNNUSI 2020 Covid-19 pandemic %28VOR%29.pdf DOI: https://doi.org/10.11113/intrest.v14nS2.71

Panagiotidou, N., Pitt, M., & Lu, Q. (2023). Building information modelling execution plans: a global review. Proceedings of the Institution of Civil Engineers - Smart Infrastructure and Construction, 176(3), 126–147. https://doi.org/10.1680/jsmic.22.00012 DOI: https://doi.org/10.1680/jsmic.22.00012

Perera, G., Nilupulee, M., Kalpani, W., Dissanayake, Y., & Bandara, K. (2021). Barrier Analysis to Implement Building Information Modeling (BIM) Execution Plan in Sri Lankan Construction Industry. 1–8.

Rocha, Á., Correia, A. M., Costanzo, S., & Reis, L. P. (2015). New Contributions in Information Systems and Technologies. Advances in Intelligent Systems and Computing, 353(March), III–IV. https://doi.org/10.1007/978-3-319-16486-1 DOI: https://doi.org/10.1007/978-3-319-16528-8

Silva, I. R. O. da, & Andrade, M. L. V. X. de. (2020). BIM Project Execution Plan for Infrastructure Superintendence (SINFRA) of the Federal University of Pernambuco: presentation of a case study. 522–527. https://doi.org/10.5151/sigradi2020-72 DOI: https://doi.org/10.5151/sigradi2020-72

Tan, C. K. L., & Abdul-Samad, Z. (2022). A study of the impact of COVID-19 on construction workforce productivity in Malaysia. International Journal of Productivity and Performance Management. https://doi.org/10.1108/IJPPM-07-2021-0421 DOI: https://doi.org/10.1108/IJPPM-07-2021-0421

Teles, A. R. V., & Lima, M. M. X. de. (2023). The development of a BIM Execution Plan for contracting public work projects. 777–786. https://doi.org/10.5151/sigradi2022-sigradi2022_67 DOI: https://doi.org/10.5151/sigradi2022-sigradi2022_67

Tung, Y. H., Chia, F. C., & Yan-Yan, F. Y. (2021). EXPLORING the USAGE of DIGITAL TECHNOLOGIES for CONSTRUCTION PROJECT MANAGEMENT. Planning Malaysia, 19(3), 13–22. https://doi.org/10.21837/PM.V19I17.983 DOI: https://doi.org/10.21837/pm.v19i17.983

Ventura, M. (2021). review of guides in the USA Conference or Workshop Item.

Wasihun Bezabih Bekele, & Fikire Yohanes Ago. (2022). View of Sample Size for Interview in Qualitative Research in Social Sciences: A Guide to Novice Researchers | Research in Educational Policy and Management. 20, 42–50. https://repamjournal.org/index.php/REPAM/article/view/51/30 DOI: https://doi.org/10.46303/repam.2022.3

Zamani, S. H., Rahman, R. A., Fauzi, M. A., & Yusof, L. M. (2021). Effect of COVID-19 on building construction projects: Impact and response mechanisms. IOP Conference Series: Earth and Environmental Science, 682(1). https://doi.org/10.1088/1755-1315/682/1/012049 DOI: https://doi.org/10.1088/1755-1315/682/1/012049

Zamani, S. H., Rahman, R. A., & Yusof, L. M. (2023). WELL Building: Criteria for Residential Buildings in a Developing Country. Journal of Engineering, Project, and Production Management, 13(3), 1–14. https://doi.org/10.32738/JEPPM-2023-0018 DOI: https://doi.org/10.32738/JEPPM-2023-0018

Downloads

Published

2024-07-29

How to Cite

Mahazir, M., A. Rahman, R., Mohd Zainudin, N., & Salleh, S. (2024). CONSTRUCTION PROJECT FAILURE: INVESTIGATING CAUSES OF INEFFECTIVE BUILDING INFORMATION MODELLING EXECUTION PLANS. PLANNING MALAYSIA, 22(32). https://doi.org/10.21837/pm.v22i32.1492